
Project Planning with Primavera P6
- تحميل PDF فوري بعد الدفع
- المراجعة A وكل مراجعة لاحقة مجانًا
- الدليل ليس ما تحتاجه؟ راسلنا خلال 14 يومًا لاسترداد المبلغ
عن هذا الدليل
A schedule is not software output; it is a model of how the project will be built. This guide teaches the logic first and the program second: how durations are built, why an activity becomes critical, how progress is measured, and how an extension of time is calculated in numbers rather than argued in letters. The work breakdown structure and its activities, durations from quantities and productivity, logic and constraints, the critical path and float by forward and backward pass, resources and cost and the S-curve, updating and measuring progress by earned value, delay analysis and extension of time, and schedule quality against the DCMA checks. 7 fully worked examples, every number checked. To Oracle Primavera P6 EPPM / Professional — User and Reference Guides, AACE International Recommended Practices (10S-90 · 37R-06 · 49R-06), AACE RP 29R-03 · SCL Delay and Disruption Protocol. 28 pages · Level EL 200 · Revision A. Whoever owns revision A receives every later revision free.
على الرف نفسه